Old stormwater pipe at a structure on Alamance Drive

Stormwater

Alamance Drive Drainage Improvements

Drainage Assistance Program

This project will improve the stormwater system at a property on Alamance Drive. The pipe is in poor condition causing a home to flood during heavy rainstorms.

Project Details

 
Type:
Stormwater
Budget:
$600,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Jordan Pack
Engineer
[email protected]
919-996-4080

 
Lead Department:
Engineering Services

Subscribe

 

Pre-Approval

This phase is complete. 

Lead Department:
Engineering Services

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

We are working with the consultant to pursue an alternative design concept.

Project Goals

  • Redirect water flow from 3410 Alamance Drive
  • Replace and upsize the stormwater system under Alleghany Road
Lead Department:
Engineering Services

Construction

Construction for this project is anticipated to begin early 2026.

Lead Department:
Engineering Services

Schedule

Date Activity
Spring 2021 Project planning
Summer 2024 Project design begins
Early 2026 Project construction begins
TBD Project construction complete